At long last! Work has resumed this project that we affectionately
call our “bundle of sticks.” We have had various delays of one kind or another
but now some progress is possible. The major work will be handled by Bell Construction
for the duration of this project. I will
be posting my journal entries “as is” with very little editing outside of grammar
and spelling. For better or for worse.
|
The house with the add-on removed |
The first order of business was to remove the rear section of the house removed. I for one will not miss it at all. 90% of the problems with this project stemmed from that nonsense. Leaks, roofing, funky construction, bad engineering, and spiders form hell, goodbye and good riddance.
|
From the Rear. |
كشف تسربات
ReplyDeleteشركة تنظيف فلل في الرياض
شركة نقل اثاث
شركة مكافحة حشرات
شركة تنظيف خزانات
شركة نقل اثاث بالدمام
شركة تنظيف بالدمام
شركة مكافحة حشرات بالدمام
مكافحة حشرات
شركة تنظيف منازل في الرياض
شركة نقل العفش في الرياض
شركة نقل اثاث في الرياض
شركة رش مبيدات بالرياض
عزل الاسطح
تنظيف شقق في الرياض
تنظيف موكيت بالرياض
شركة تنظيف مجالس في الرياض